Solar, Battery Storage and EV Charging Solar, battery storage, and EV charging on real estate.
Clean energy equipment can produce income or cut costs for a building. It also puts a long-term occupant on the roof, in the basement, or in the garage.
We represent building owners, landowners, developers, co-op and condominium boards, and energy companies in leases, licenses, and agreements for solar, battery storage, and electric vehicle charging in New York.
Owners can host clean energy equipment in several ways: leasing a roof or land to a solar developer, buying the power produced under a power purchase agreement, participating in a community solar project, or installing equipment themselves. Each structure has different real estate consequences. A roof or land lease gives a third party long-term possession and access rights, often for twenty years or more, and the agreement has to address roof warranties and replacement, insurance, removal, decommissioning, lender consents, and what happens on a sale of the property.
Battery storage is regulated primarily as a fire safety matter. Outside New York City, the State’s Fire Code governs energy storage systems, and the 2025 New York State Fire Code, which took effect January 1, 2026, followed the State’s Inter-Agency Fire Safety Working Group review of battery storage safety announced in July 2023. New York City has its own Fire Code and building codes, and battery systems in the City require FDNY and Department of Buildings approvals. Leases and site agreements for storage should allocate responsibility for permits, emergency response plans, monitoring, and decommissioning.
EV charging is increasingly required rather than optional. New York City’s Local Law 55 of 2024 requires licensed garages and open parking lots with 10 or more spaces to provide Level 2 charging at 20% of spaces, and to make an additional 40% of spaces capable of supporting chargers, by January 1, 2035, and it sets requirements for new and significantly altered facilities. Owners leasing parking to operators, or engaging charging companies, should decide who installs, owns, maintains, and pays for the equipment and the electrical upgrades.
Our capabilities include:
- Rooftop and ground solar leases and licenses
- Power purchase agreements and community solar arrangements
- Battery energy storage site leases and permitting coordination
- EV charging agreements and Local Law 55 of 2024 planning
- Interconnection and utility agreements
- Co-op and condominium approvals for shared-roof and garage projects
- Lender consents, SNDAs, and recorded memoranda
- Removal, decommissioning, and restoration terms
Key terms in a solar or storage site lease
| Term | Often 20 to 25 years, with extension options tied to the life of the equipment |
|---|---|
| Rent | Fixed annual rent per installed kilowatt or acre, a share of revenue, or discounted power |
| Roof work | Allocation of roof replacement before installation, warranty protection, and removal and reinstallation costs |
| Access | Defined access routes, notice requirements, and coordination with building operations |
| Insurance and indemnity | Developer coverage for property damage, liability, and equipment; owner named as additional insured |
| Decommissioning | Removal and restoration obligations, backed by a bond or other security |
| Financing | Developer lender rights such as notice, cure, and new-lease rights, and owner lender consent |
Regulatory points to address
Fire code approvals
Battery systems must meet the applicable fire code; in New York City, the FDNY and Department of Buildings review installations under the City’s codes.
Solar roof requirements
New York City’s Local Laws 92 and 94 of 2019 require solar or green roof systems on new buildings and on certain roof replacements, subject to exceptions.
EV charging mandates
Local Law 55 of 2024 sets charging and EV-ready requirements for licensed garages and lots with 10 or more spaces, with waivers available in limited circumstances.
Interconnection
Projects connecting to the grid follow utility interconnection rules, and the costs of required upgrades can affect project feasibility.
Compensation
Exported energy is compensated under net metering or the Value of Distributed Energy Resources (VDER) framework, depending on the project.
Local Law 97
On-site solar and other clean energy measures can affect a covered building’s emissions calculations, but the effect depends on the project and the current rules.
Hosting a solar or storage project
Assess the site
Confirm roof condition, structural capacity, electrical service, and available space, and replace an aging roof first.
Check approvals
Review mortgages, ground leases, co-op or condo documents, and existing leases for consent requirements.
Negotiate the agreement
Set term, rent, access, roof protection, insurance, removal, and financing terms.
Permit and interconnect
The developer obtains building, electrical, and fire approvals and the utility interconnection agreement.
Record and monitor
Record a memorandum of lease, track the developer’s compliance, and plan for removal at the end of the term.
Key terms
- Power purchase agreement (PPA)
- An agreement to buy electricity from a system owned by a third party, often installed on the buyer’s property.
- Community solar
- A solar project whose output credits are shared among multiple subscribers, often called community distributed generation in New York.
- Net metering
- Crediting a customer for electricity a system exports to the grid.
- VDER
- The Value of Distributed Energy Resources, New York’s framework for compensating many distributed energy projects, also called the Value Stack.
- Battery energy storage system (BESS)
- A system that stores electricity in batteries for later use or export.
- Interconnection
- The process and agreement for connecting a generating or storage system to the utility grid.
- Level 2 charger
- An EV charger using 208 or 240 volt power, common in garages and workplaces.
- DC fast charger
- A high-powered charger that can charge an EV much faster than a Level 2 charger.
- EV-ready
- A parking space with electrical capacity and infrastructure to support a future charger.
- Decommissioning
- Removal of equipment and restoration of the site at the end of a project.
- Ballasted system
- A rooftop solar array held in place by weight rather than roof penetrations.
- Memorandum of lease
- A short recorded document giving public notice of a lease.
- Local Laws 92 and 94 of 2019
- New York City laws requiring solar or green roof systems on new buildings and certain roof replacements.
- Local Law 55 of 2024
- New York City’s law requiring EV chargers and EV-ready spaces in covered garages and parking lots.
Questions we hear most
Will a solar lease affect my roof warranty?
Can a battery storage system be installed in a New York City building?
Does Local Law 55 of 2024 apply to my garage?
What happens to the solar equipment if I sell the building?
Should the owner or the developer own the solar system?
Can a co-op lease its roof for solar?
Who pays for electrical upgrades for EV chargers?
Do battery systems require special insurance?
Can a solar lease be terminated early?
Does on-site solar help with Local Law 97?
Get in touch
Tell us about your matter — real estate, leasing, a dispute, estate planning, or a billing claim. Initial consultations are complimentary, and we provide a clear scope and fee quote at the outset.
- Phone(212) 300-3191
- Emailinquiries@madisonlawfirm.com
- Office579 Fifth Avenue, 2nd Floor
New York, NY 10017 - HoursMonday – Friday, 9:00 AM – 6:00 PM
After-hours by appointment
Send an inquiry
Tell us about the matter and we will respond within one business day.