Solar, Battery Storage and EV Charging Solar, battery storage, and EV charging on real estate.

Clean energy equipment can produce income or cut costs for a building. It also puts a long-term occupant on the roof, in the basement, or in the garage.

We represent building owners, landowners, developers, co-op and condominium boards, and energy companies in leases, licenses, and agreements for solar, battery storage, and electric vehicle charging in New York.

Owners can host clean energy equipment in several ways: leasing a roof or land to a solar developer, buying the power produced under a power purchase agreement, participating in a community solar project, or installing equipment themselves. Each structure has different real estate consequences. A roof or land lease gives a third party long-term possession and access rights, often for twenty years or more, and the agreement has to address roof warranties and replacement, insurance, removal, decommissioning, lender consents, and what happens on a sale of the property.

Battery storage is regulated primarily as a fire safety matter. Outside New York City, the State’s Fire Code governs energy storage systems, and the 2025 New York State Fire Code, which took effect January 1, 2026, followed the State’s Inter-Agency Fire Safety Working Group review of battery storage safety announced in July 2023. New York City has its own Fire Code and building codes, and battery systems in the City require FDNY and Department of Buildings approvals. Leases and site agreements for storage should allocate responsibility for permits, emergency response plans, monitoring, and decommissioning.

EV charging is increasingly required rather than optional. New York City’s Local Law 55 of 2024 requires licensed garages and open parking lots with 10 or more spaces to provide Level 2 charging at 20% of spaces, and to make an additional 40% of spaces capable of supporting chargers, by January 1, 2035, and it sets requirements for new and significantly altered facilities. Owners leasing parking to operators, or engaging charging companies, should decide who installs, owns, maintains, and pays for the equipment and the electrical upgrades.

Our capabilities include:

  • Rooftop and ground solar leases and licenses
  • Power purchase agreements and community solar arrangements
  • Battery energy storage site leases and permitting coordination
  • EV charging agreements and Local Law 55 of 2024 planning
  • Interconnection and utility agreements
  • Co-op and condominium approvals for shared-roof and garage projects
  • Lender consents, SNDAs, and recorded memoranda
  • Removal, decommissioning, and restoration terms

Key terms in a solar or storage site lease

TermOften 20 to 25 years, with extension options tied to the life of the equipment
RentFixed annual rent per installed kilowatt or acre, a share of revenue, or discounted power
Roof workAllocation of roof replacement before installation, warranty protection, and removal and reinstallation costs
AccessDefined access routes, notice requirements, and coordination with building operations
Insurance and indemnityDeveloper coverage for property damage, liability, and equipment; owner named as additional insured
DecommissioningRemoval and restoration obligations, backed by a bond or other security
FinancingDeveloper lender rights such as notice, cure, and new-lease rights, and owner lender consent

Regulatory points to address

  • Fire code approvals

    Battery systems must meet the applicable fire code; in New York City, the FDNY and Department of Buildings review installations under the City’s codes.

  • Solar roof requirements

    New York City’s Local Laws 92 and 94 of 2019 require solar or green roof systems on new buildings and on certain roof replacements, subject to exceptions.

  • EV charging mandates

    Local Law 55 of 2024 sets charging and EV-ready requirements for licensed garages and lots with 10 or more spaces, with waivers available in limited circumstances.

  • Interconnection

    Projects connecting to the grid follow utility interconnection rules, and the costs of required upgrades can affect project feasibility.

  • Compensation

    Exported energy is compensated under net metering or the Value of Distributed Energy Resources (VDER) framework, depending on the project.

  • Local Law 97

    On-site solar and other clean energy measures can affect a covered building’s emissions calculations, but the effect depends on the project and the current rules.

Hosting a solar or storage project

  1. Assess the site

    Confirm roof condition, structural capacity, electrical service, and available space, and replace an aging roof first.

  2. Check approvals

    Review mortgages, ground leases, co-op or condo documents, and existing leases for consent requirements.

  3. Negotiate the agreement

    Set term, rent, access, roof protection, insurance, removal, and financing terms.

  4. Permit and interconnect

    The developer obtains building, electrical, and fire approvals and the utility interconnection agreement.

  5. Record and monitor

    Record a memorandum of lease, track the developer’s compliance, and plan for removal at the end of the term.

Key terms

Power purchase agreement (PPA)
An agreement to buy electricity from a system owned by a third party, often installed on the buyer’s property.
Community solar
A solar project whose output credits are shared among multiple subscribers, often called community distributed generation in New York.
Net metering
Crediting a customer for electricity a system exports to the grid.
VDER
The Value of Distributed Energy Resources, New York’s framework for compensating many distributed energy projects, also called the Value Stack.
Battery energy storage system (BESS)
A system that stores electricity in batteries for later use or export.
Interconnection
The process and agreement for connecting a generating or storage system to the utility grid.
Level 2 charger
An EV charger using 208 or 240 volt power, common in garages and workplaces.
DC fast charger
A high-powered charger that can charge an EV much faster than a Level 2 charger.
EV-ready
A parking space with electrical capacity and infrastructure to support a future charger.
Decommissioning
Removal of equipment and restoration of the site at the end of a project.
Ballasted system
A rooftop solar array held in place by weight rather than roof penetrations.
Memorandum of lease
A short recorded document giving public notice of a lease.
Local Laws 92 and 94 of 2019
New York City laws requiring solar or green roof systems on new buildings and certain roof replacements.
Local Law 55 of 2024
New York City’s law requiring EV chargers and EV-ready spaces in covered garages and parking lots.

Questions we hear most

Will a solar lease affect my roof warranty?

It can. Penetrations and ballast can void or limit a roof warranty unless the roofer approves the installation. The lease should require installation methods acceptable to the roofer and make the developer responsible for damage.

Can a battery storage system be installed in a New York City building?

Possibly, but battery systems in the City require approvals under the City’s fire and building codes, including FDNY review. Location, system size, and battery chemistry all affect what is permitted.

Does Local Law 55 of 2024 apply to my garage?

It applies to licensed garages and open lots with 10 or more spaces, which must have Level 2 chargers at 20% of spaces and EV-ready capacity at another 40% by January 1, 2035. Requirements for unlicensed facilities are to be set by rule.

What happens to the solar equipment if I sell the building?

A recorded lease generally binds the buyer. Owners planning a sale or redevelopment should negotiate termination or relocation rights and make sure the lease can be assigned with the property.

Should the owner or the developer own the solar system?

Owning the system gives the owner the energy value and any incentives, but also the cost, maintenance, and risk. A lease or PPA shifts those to the developer in exchange for rent or discounted power.

Can a co-op lease its roof for solar?

Generally yes, acting through the board as the bylaws and proprietary leases allow. Boards should confirm whether shareholder approval is required, how revenue is allocated, and how the installation affects roof access for shareholders.

Who pays for electrical upgrades for EV chargers?

That is negotiated. Charging companies sometimes fund equipment in exchange for revenue, while owners may pay for service upgrades. Utility and state incentive programs may cover part of the cost, subject to their current terms.

Do battery systems require special insurance?

Insurers increasingly ask about battery systems, and coverage terms vary. The site agreement should require the operator to carry appropriate coverage and should confirm the installation does not breach the owner’s own policy.

Can a solar lease be terminated early?

Only as the lease allows. Owners should negotiate termination or relocation rights for redevelopment, roof replacement, and sale, with defined notice and cost allocation.

Does on-site solar help with Local Law 97?

It may reduce a building’s reported emissions or be accounted for under the law’s rules, but the effect depends on the system, the building, and the Department of Buildings’ current rules. The analysis should be done with the building’s energy consultant.
Contact

Get in touch

Tell us about your matter — real estate, leasing, a dispute, estate planning, or a billing claim. Initial consultations are complimentary, and we provide a clear scope and fee quote at the outset.

Send an inquiry

Tell us about the matter and we will respond within one business day.

All inquiries are confidential. Initial consultation is complimentary. We will respond within one business day.

Skip to main content