Data centers and digital infrastructure.

A data center site is worth what its power, fiber, and permits can support. The real estate documents have to account for all three.

We represent owners, developers, investors, and occupiers in acquiring, developing, financing, and leasing data center and digital infrastructure properties in New York City, Long Island, and upstate New York.

Data center transactions look like industrial real estate deals, but the critical diligence items are different. Buyers and tenants need to know how much electric capacity is available at the site, when it can be delivered, who pays for the utility upgrades, and what the utility will require in deposits, security, and minimum-load commitments. They also need to know whether the site has diverse fiber routes, whether zoning permits the use, and whether backup generators, cooling systems, and water use can be permitted. A purchase contract or lease that does not allocate those risks leaves the most expensive questions unanswered.

New York has made large loads a regulatory priority. On February 12, 2026, the Public Service Commission instituted a proceeding, Case 26-E-0045, on interconnection processes, cost allocation, and tariffs for large loads, including data centers; the State reported more than 11 gigawatts of large-load requests across 48 projects in the NYISO queue as of January 2026. Executive Order 62, effective July 14, 2026, paused certain discretionary Department of Environmental Conservation approvals for data centers that use or can use 50 megawatts or more, with stated exemptions, until the Department of Public Service completes a generic environmental impact statement. The order does not apply to local government permits, and its effect on any particular project should be confirmed.

Leases and colocation agreements allocate operational risk as much as space. A powered shell lease delivers the building and utility capacity and leaves the tenant to fit out the technical space; a turnkey lease delivers a finished data hall with power and cooling infrastructure, usually with service level commitments. A colocation arrangement, where a customer occupies cabinets or cages in a shared facility, is often written as a license or service agreement rather than a lease, which affects remedies, the treatment of the agreement in bankruptcy, and whether real estate law protections apply at all.

Our capabilities include:

  • Data center site acquisitions and power and fiber diligence
  • Powered shell, turnkey, and build-to-suit leases
  • Colocation, interconnection, and meet-me room agreements
  • Utility service, large-load, and facilities agreements
  • Zoning, SEQRA, and DEC air and water permitting coordination
  • IDA benefits and PILOT agreements
  • Joint ventures, development agreements, and financing
  • Conversions of industrial and office buildings to digital infrastructure use

Lease structures compared

Powered shellLandlord delivers the building, structure, and contracted utility capacity; tenant designs and installs the electrical, mechanical, and cooling systems
Turnkey (wholesale)Landlord delivers a finished data hall with power, cooling, and redundancy to agreed specifications, usually with service level commitments
Build-to-suitLandlord develops a facility to the tenant’s design under a development agreement and long-term lease
ColocationCustomer occupies cabinets, cages, or suites in a shared facility under a license or master services agreement
Ground leaseDeveloper leases land long-term and owns the improvements, common for large campuses and utility-scale sites
Key economic termRent is often tied to critical IT load (kW or MW) rather than square footage

Diligence items specific to data centers

  • Power capacity and timing

    Confirm what the utility has committed in writing, the delivery schedule, the cost of substation and transmission upgrades, and who bears the risk of delay.

  • Large-load terms

    Review deposits, contributions in aid of construction, minimum demand or take-or-pay commitments, and assignment rights in the utility agreements.

  • Fiber and connectivity

    Confirm carrier presence, diverse entry points, conduit rights, and the right to build and operate a meet-me room.

  • Zoning and land use

    Confirm the use is permitted or what approvals are required; many local codes do not expressly list data centers, which can require an interpretation, a special permit, or a rezoning.

  • Environmental permits

    Backup generators generally require air permitting or registration under DEC regulations at 6 NYCRR Part 201, and in New York City may also require registration with the Department of Environmental Protection; large water withdrawals for cooling may require a DEC permit.

  • Incentives and taxes

    Industrial development agency benefits, typically sales tax exemptions, mortgage recording tax exemptions, and PILOT agreements, carry job, investment, and recapture terms that bind the project.

Developing a data center site

  1. Control the site

    Use an option or a purchase contract with a long diligence period and conditions tied to power, zoning, and permits.

  2. Secure power

    Submit the utility load request, negotiate the facilities and service agreements, and track the regulatory process for large loads.

  3. Obtain approvals

    Complete SEQRA review, land use approvals, and air, water, and stormwater permits, including any approvals affected by Executive Order 62.

  4. Negotiate incentives

    Apply for IDA benefits and negotiate the PILOT schedule, job commitments, recapture provisions, and any community benefit terms.

  5. Lease and finance

    Sign the anchor lease or pre-lease, then close construction financing with the power and permit milestones as conditions.

Key terms

Critical IT load
The electric capacity available to power customer computing equipment, often the basis for data center rent.
Powered shell
A building delivered with structure and contracted utility capacity but without technical fit-out.
Turnkey data center
A fully built data hall delivered with power, cooling, and redundancy systems in place.
Colocation
An arrangement in which multiple customers place equipment in a shared facility operated by a provider.
Meet-me room
A secure room where carriers and customers interconnect their networks within a data center.
Cross-connect
A physical cable connection between two parties’ equipment inside a data center, usually billed monthly.
Redundancy (N+1, 2N)
Backup capacity in power and cooling systems; N+1 adds one spare component, while 2N duplicates the full system.
Service level agreement (SLA)
Commitments on uptime, power, and environmental conditions, with service credits or termination rights if they are missed.
Large load
A customer whose electric demand is large enough to require special interconnection study and utility upgrades.
Contribution in aid of construction
A customer payment to a utility to cover the cost of facilities built to serve that customer.
PUE
Power usage effectiveness, the ratio of total facility power to IT equipment power, a common efficiency measure.
Industrial development agency (IDA)
A public benefit corporation that may grant sales tax, mortgage recording tax, and real property tax benefits to qualifying projects.
PILOT
A payment in lieu of taxes agreement under which a project pays scheduled amounts instead of full real property taxes.
SEQRA
The State Environmental Quality Review Act, which requires environmental review of discretionary government approvals.
Generic environmental impact statement (GEIS)
An environmental review that addresses a category of actions, such as the State’s review of data centers and large loads.

Questions we hear most

What is the difference between a powered shell and a turnkey data center lease?

A powered shell lease delivers the building and contracted electric capacity, and the tenant builds out the technical infrastructure. A turnkey lease delivers a finished data hall with power and cooling systems in place, and the landlord usually takes on service level obligations for uptime, temperature, and humidity.

Is a colocation agreement a lease?

Usually not. Colocation arrangements are commonly structured as licenses or service agreements, which give the customer use rights rather than a leasehold interest. The label matters less than the substance, so the agreement should state its intended character and the remedies for each side.

Does Executive Order 62 stop all data center construction in New York?

No. It paused certain discretionary DEC approvals for data centers that use or can use 50 megawatts or more, with stated exemptions, pending a generic environmental impact statement. It does not apply to local government permits, and projects that do not need discretionary DEC approvals may proceed differently.

Who pays for utility upgrades for a new data center?

That is a central question in the Public Service Commission’s large-load proceeding, Case 26-E-0045, which is examining cost allocation for large loads. Under current utility tariffs and agreements, large customers often bear substantial upgrade costs, and the allocation should be negotiated and reflected in the lease and purchase documents.

Does a data center lease need a different form from an industrial lease?

Yes. A data center lease has to address power capacity and delivery, redundancy, cooling, fiber access, generator and fuel rights, security, and service levels, none of which a standard industrial form covers adequately.

What happens if the utility delivers power late?

That depends on the documents. Leases and development agreements commonly include outside dates, rent abatement, or termination rights tied to power delivery, and the landlord’s utility agreement may limit what it can recover from the utility.

Are backup generators regulated?

Yes. Generators are air emission sources regulated by DEC, and in New York City the Department of Environmental Protection also regulates them. Emergency-use limits on operating hours often determine which permit or registration applies.

Can a data center get an IDA PILOT?

Many IDAs consider data center projects, but each IDA applies its own policies on eligibility, job creation, and benefits. The State has also indicated it will pursue legislation in 2027 on incentives and infrastructure cost allocation for very large facilities.

Does Executive Order 62 apply in New York City?

The order applies statewide to the DEC approvals it covers, for data centers at or above the 50 megawatt threshold. Smaller facilities, and projects needing only local approvals, are generally outside its permit pause.

Can an office building be converted to data center use?

Sometimes. The building needs adequate floor loads, ceiling heights, power capacity, space for generators and cooling equipment, and a use permitted by zoning and the certificate of occupancy. Many office buildings cannot meet those requirements without major work.
Contact

Get in touch

Tell us about your matter — real estate, leasing, a dispute, estate planning, or a billing claim. Initial consultations are complimentary, and we provide a clear scope and fee quote at the outset.

Send an inquiry

Tell us about the matter and we will respond within one business day.

All inquiries are confidential. Initial consultation is complimentary. We will respond within one business day.

Skip to main content