Life Science and Lab Leases for Landlords Laboratory leasing for landlords.

Lab tenants pay more for purpose-built space, but they also use up building capacity and leave chemicals behind. The lease should ration the first and prevent the second.

We represent owners and developers leasing laboratory, research, and life science space, including office-to-lab conversions.

Control-area capacity is a shared building resource. Fire and building codes limit hazardous materials per control area and per floor, so one tenant can use up capacity a later tenant needs. Landlords should allocate capacity in each lease, require a current chemical inventory, and reserve the right to audit and require reductions.

Landlords should also control base-building systems that lab tenants rely on: shafts, roof space for exhaust fans and generators, emergency power, and tie-ins to risers and drains. At the end of the term, a decommissioning standard, a consultant’s closure report, and the right to hold security until it is delivered protect the next tenant and the building’s value.

Our capabilities include:

  • Allocation of control-area and hazardous-materials capacity
  • Shaft, roof, and generator rights
  • Approval of lab design and building-system tie-ins
  • Environmental indemnities and insurance
  • Decommissioning standards and closure reports
  • Security sized to restoration risk

What landlords should protect

  • Capacity

    A defined share of control-area limits, emergency power, and exhaust capacity.

  • Systems

    Approval of design, tie-ins, and roof equipment, and maintenance by approved contractors.

  • Environmental

    A baseline condition report at delivery and an indemnity that survives the lease.

  • Insurance

    Pollution liability where the tenant’s operations warrant it, naming the landlord.

  • End of term

    Decommissioning to an agreed standard, with a closure report before surrender.

Key terms

Capacity allocation
A lease provision assigning each tenant a share of control-area limits, power, and exhaust.
Chemical inventory
A tenant’s current list of hazardous materials and quantities, delivered to the landlord on request.
Baseline report
An environmental assessment at delivery establishing the space’s starting condition.
Environmental indemnity
The tenant’s promise to cover costs from its hazardous materials, surviving the lease.
Pollution liability insurance
Coverage for contamination claims, which general liability policies often exclude.
Roof rights
The landlord’s grant of roof space for exhaust fans, stacks, or generators, with conditions.
Shaft rights
The right to run supply, exhaust, or utility lines through building shafts.
Tie-in approval
Landlord approval of connections to risers, drains, and electrical service.
Closure report
A consultant’s report documenting decommissioning before surrender.
Surviving obligations
Lease duties, such as environmental indemnity, that continue after the term ends.
Letter of credit
Bank-issued security that should cover decommissioning risk.
Remaining infrastructure
Lab improvements the landlord elects to keep for future tenants.

Questions we hear most

Should I get a baseline environmental report?

Yes. A report at delivery establishes the space’s condition, so responsibility for later contamination can be assigned to the tenant that caused it.

Can I make the tenant leave the lab improvements?

You can require that certain infrastructure stay, such as exhaust, generators, and pure water systems, which can help re-leasing, while requiring removal of tenant equipment and hazardous materials.

What if a lab tenant goes out of business?

Startups do. Security deposits or letters of credit should cover decommissioning, and the lease should allow the landlord to complete it at the tenant’s cost.

How do I allocate control-area capacity among tenants?

Assign each lab tenant a share of the floor’s capacity in its lease, require inventories, and reserve the right to reallocate or require reductions when needed for code compliance.

Should I allow generators?

Often yes, on conditions. Approve location, fuel storage, testing, noise, and permits, and require the tenant to remove or maintain them under the lease.

Do I need pollution insurance from the tenant?

For wet labs, it is often prudent. General liability policies commonly exclude pollution, so the lease can require separate coverage naming the landlord.

What standard should decommissioning meet?

A recognized industry standard or an agreed checklist, carried out by a qualified consultant. The lease should state it, so the parties are not arguing about it at surrender.

Can I inspect the lab?

Reserve that right on reasonable notice, with accommodations for safety and confidentiality, and require the tenant to provide permits and inventories.

What about lab tenants with venture funding only?

Security, a letter of credit that does not burn down before decommissioning, and limits on transfers protect the landlord if funding runs out.
Contact

Get in touch

Tell us about the space, the parties, and the timing. Initial consultations are complimentary, and we provide a clear scope and fee quote at the outset.

Send an inquiry

Tell us about the matter and we will respond within one business day.

All inquiries are confidential. Initial consultation is complimentary. We will respond within one business day.

Skip to main content