Life Science and Lab Leases for Landlords Laboratory leasing for landlords.
Lab tenants pay more for purpose-built space, but they also use up building capacity and leave chemicals behind. The lease should ration the first and prevent the second.
We represent owners and developers leasing laboratory, research, and life science space, including office-to-lab conversions.
Control-area capacity is a shared building resource. Fire and building codes limit hazardous materials per control area and per floor, so one tenant can use up capacity a later tenant needs. Landlords should allocate capacity in each lease, require a current chemical inventory, and reserve the right to audit and require reductions.
Landlords should also control base-building systems that lab tenants rely on: shafts, roof space for exhaust fans and generators, emergency power, and tie-ins to risers and drains. At the end of the term, a decommissioning standard, a consultant’s closure report, and the right to hold security until it is delivered protect the next tenant and the building’s value.
Our capabilities include:
- Allocation of control-area and hazardous-materials capacity
- Shaft, roof, and generator rights
- Approval of lab design and building-system tie-ins
- Environmental indemnities and insurance
- Decommissioning standards and closure reports
- Security sized to restoration risk
What landlords should protect
Capacity
A defined share of control-area limits, emergency power, and exhaust capacity.
Systems
Approval of design, tie-ins, and roof equipment, and maintenance by approved contractors.
Environmental
A baseline condition report at delivery and an indemnity that survives the lease.
Insurance
Pollution liability where the tenant’s operations warrant it, naming the landlord.
End of term
Decommissioning to an agreed standard, with a closure report before surrender.
Key terms
- Capacity allocation
- A lease provision assigning each tenant a share of control-area limits, power, and exhaust.
- Chemical inventory
- A tenant’s current list of hazardous materials and quantities, delivered to the landlord on request.
- Baseline report
- An environmental assessment at delivery establishing the space’s starting condition.
- Environmental indemnity
- The tenant’s promise to cover costs from its hazardous materials, surviving the lease.
- Pollution liability insurance
- Coverage for contamination claims, which general liability policies often exclude.
- Roof rights
- The landlord’s grant of roof space for exhaust fans, stacks, or generators, with conditions.
- Shaft rights
- The right to run supply, exhaust, or utility lines through building shafts.
- Tie-in approval
- Landlord approval of connections to risers, drains, and electrical service.
- Closure report
- A consultant’s report documenting decommissioning before surrender.
- Surviving obligations
- Lease duties, such as environmental indemnity, that continue after the term ends.
- Letter of credit
- Bank-issued security that should cover decommissioning risk.
- Remaining infrastructure
- Lab improvements the landlord elects to keep for future tenants.
Questions we hear most
Should I get a baseline environmental report?
Can I make the tenant leave the lab improvements?
What if a lab tenant goes out of business?
How do I allocate control-area capacity among tenants?
Should I allow generators?
Do I need pollution insurance from the tenant?
What standard should decommissioning meet?
Can I inspect the lab?
What about lab tenants with venture funding only?
Get in touch
Tell us about the space, the parties, and the timing. Initial consultations are complimentary, and we provide a clear scope and fee quote at the outset.
- Phone(212) 300-3191
- Emailinquiries@madisonlawfirm.com
- Office579 Fifth Avenue, 2nd Floor
New York, NY 10017 - HoursMonday – Friday, 9:00 AM – 6:00 PM
After-hours by appointment
Send an inquiry
Tell us about the matter and we will respond within one business day.