Life Science and Lab Leases for Tenants Laboratory leasing for life science companies.

Your science depends on power, air, and a schedule that does not slip. The lease should lock in the building’s capacity and leave room to grow.

We represent biotech, pharmaceutical, diagnostics, and research companies leasing laboratory space in New York City and the suburbs.

Tenants should obtain base-building specifications as lease exhibits: floor load, vibration criteria, air-change rates, exhaust capacity, electrical service, and emergency power. If the landlord is converting space, the delivery condition and timetable should be in the work letter, with remedies for delay. Confirming the floor’s share of control-area capacity before signing prevents a permitting surprise after the lab is built.

Growth and funding cycles should shape the term. Early-stage companies need expansion rights, the ability to sublease or assign on a financing or acquisition, and limits on guaranties and letters of credit. The decommissioning obligation should be defined objectively, so the cost at the end is predictable.

Our capabilities include:

  • Base-building specifications as lease exhibits
  • Work letters, allowances, and delivery remedies
  • Control-area capacity and permit cooperation
  • 24-hour access, HVAC, and emergency power
  • Expansion, sublease, and change-of-control rights
  • Defined decommissioning obligations

What lab tenants should negotiate

  • Specifications

    Loads, vibration, HVAC, exhaust, and power stated as landlord obligations.

  • Capacity

    A committed share of control-area capacity and emergency power.

  • Operations

    24-hour access and HVAC at a fixed or capped rate.

  • Flexibility

    Expansion rights and transfers on a merger, financing, or acquisition without consent.

  • Exit

    Decommissioning to a stated standard, with no broader restoration of building improvements.

Key terms

Base-building specifications
The landlord’s commitments on loads, HVAC, power, and exhaust, attached to the lease.
Delivery condition
The state in which the landlord must turn over the space, including any landlord conversion work.
Tenant improvement allowance
The landlord’s contribution to buildout, which for labs is often substantial.
Delay remedies
Rent credits and termination rights if the landlord delivers late.
After-hours HVAC
Heating, cooling, and ventilation outside building hours, critical for labs operating around the clock.
Expansion right
A right of first offer or option on additional space.
Permitted transfer
An assignment or sublease to an affiliate, acquirer, or successor without landlord consent.
Sublease right
The right to let part of the space to another company or collaborator.
Landlord cooperation
The landlord’s duty to provide information and sign permit applications.
Decommissioning standard
The objective test the tenant must meet when leaving the lab.
Restoration carve-out
A limit excluding standard lab infrastructure from removal obligations.
Letter of credit burn-down
A scheduled reduction in the security amount as the tenant meets milestones.

Questions we hear most

What should be in my lab work letter?

The scope and specifications of landlord and tenant work, the allowance, the schedule, approvals, and remedies for delay, including rent abatement for late delivery.

Can I sublease part of my lab?

Only as the lease allows. Many companies need to share space with collaborators or sublease during a downturn, so negotiate those rights at the start.

Will I have to remove everything at the end?

It depends on the lease. Negotiate to leave infrastructure such as fume hoods and exhaust in place, and limit your obligation to decommissioning and removal of your own equipment.

Who gets the FDNY permit and C-14?

The tenant, usually. The lease should require the landlord to supply building information and sign applications that need the owner’s participation.

How do I know a building can support my lab?

Engage an engineer and lab planner before the letter of intent, and attach the building’s specifications to the lease as landlord obligations.

What if the landlord’s conversion is late?

Negotiate a delivery date, abatement for each day of delay, and a termination right after an outside date. Programs and grants have timelines that do not wait for construction.

Can I get 24-hour HVAC at a fair price?

Negotiate it in the lease, with a rate based on actual cost or a fixed schedule. Labs cannot shut down ventilation at night.

What happens if we are acquired?

Permitted transfer language should let the lease move to the acquirer without consent, provided basic conditions are met.

Can I reduce my letter of credit over time?

Often, through a burn-down tied to time, financing milestones, or financial tests. Landlords will typically keep enough to cover decommissioning.

Do I have to restore the space to office?

Only if the lease requires it. Negotiate to leave lab infrastructure in place and limit restoration to removing your equipment and decommissioning.
Contact

Get in touch

Tell us about the space, the parties, and the timing. Initial consultations are complimentary, and we provide a clear scope and fee quote at the outset.

Send an inquiry

Tell us about the matter and we will respond within one business day.

All inquiries are confidential. Initial consultation is complimentary. We will respond within one business day.