Work Letters and Build-Outs Work letters and tenant build-outs.

The work letter decides who builds the space, to what standard, on what schedule, and who pays when it costs more or takes longer. Most build-out disputes start there.

We represent landlords and tenants in negotiating work letters and resolving build-out disputes in New York City office, retail, restaurant, medical, and industrial leases.

A work letter can take several forms: the landlord builds the space to an agreed plan, the tenant builds with a landlord allowance, or the landlord delivers base building work and the tenant does the rest. Each allocates design, permits, cost overruns, and delay differently, and the rent commencement date usually depends on the result.

Delay is where the money is. A well-drafted work letter defines substantial completion, separates tenant delay from landlord delay and force majeure, and states the consequences: day-for-day rent credits, outside dates, and termination rights. It also sets how plans are approved, how change orders are priced, and what happens if a permit is delayed.

Build-outs also carry lien risk. Under the Lien Law, a contractor generally may file a notice of mechanic’s lien up to eight months after completing work on a commercial project, and an owner’s consent to the improvement can expose its interest. Leases typically require the tenant to discharge or bond any lien within a short period.

Our capabilities include:

  • Work letters, landlord’s work, and turnkey deals
  • Tenant improvement allowances and disbursement
  • Plan approval and change orders
  • Delivery, substantial completion, and rent commencement
  • Delay credits, outside dates, and termination rights
  • Permits, asbestos surveys, and Department of Buildings filings
  • Mechanic’s liens and bonding
  • Build-out disputes and claims

Three common structures

TurnkeyThe landlord designs and builds the space to an agreed plan and delivers it ready for occupancy
AllowanceThe tenant builds and the landlord reimburses costs up to a stated amount
Base building plus allowanceThe landlord delivers defined base work; the tenant completes the rest with an allowance
As isThe tenant takes the space in its current condition, often with more free rent

How a build-out runs

  1. Define the scope

    Attach base building specifications and a preliminary plan to the lease.

  2. Design and approve

    The tenant’s architect prepares plans; the landlord approves within set response times.

  3. Investigate and file

    Asbestos investigation and Department of Buildings filings precede most permits.

  4. Build

    Approved contractors build under insurance, work rules, and change-order procedures.

  5. Complete

    Substantial completion, the punch list, sign-offs, and any certificate of occupancy changes.

  6. Pay out

    The landlord disburses the allowance against invoices, lien waivers, and architect certifications.

Terms to negotiate

  • Allowance use

    Whether soft costs, furniture, cabling, and moving expenses qualify.

  • Disbursement

    Progress payments versus a single payment after completion.

  • Supervision fee

    Any landlord fee for overseeing tenant work, and its cap.

  • Offset right

    Whether the tenant may deduct an unpaid allowance from rent.

  • Restoration

    Which improvements must be removed at lease end.

Key terms

Work letter
The lease exhibit governing construction of the premises, including scope, approvals, schedule, and payment.
Landlord’s work
Construction the landlord must complete, often base building items, before delivery.
Tenant’s work
Construction the tenant performs, usually with its own architect and contractor.
Turnkey
A build-out in which the landlord delivers the finished space to an agreed plan.
Tenant improvement allowance
A landlord contribution toward the tenant’s build-out, usually stated per square foot.
Hard costs and soft costs
Construction costs versus design, permit, and consulting fees; leases often cap the allowance share for soft costs.
Substantial completion
Completion except for minor punch list items that do not interfere with use.
Punch list
Minor remaining items to be finished after substantial completion.
Tenant delay
Delay caused by the tenant, such as late plans or change orders, which does not extend the landlord’s deadlines.
Change order
A written change to the approved scope, with its cost and schedule effect.
ACP-5
The Department of Environmental Protection form certifying an asbestos investigation, generally required before a Department of Buildings permit.
Mechanic’s lien
A lien a contractor or supplier may file against real property for unpaid improvement work.
Lien Law § 10
The provision setting the time to file a notice of lien, generally eight months after completion for most projects and four months for a single-family dwelling.
Bonding a lien
Posting a bond or deposit to discharge a lien from the property while the claim is resolved.
Lien waiver
A contractor’s written release of lien rights for payments received, often a condition of allowance disbursement.
Supervision fee
A landlord charge for overseeing tenant work, often a percentage of cost.

Questions we hear most

When does rent start if the build-out is late?

Whatever the lease says. Many leases tie rent commencement to substantial completion of landlord’s work or a set period after delivery, with day-for-day extensions for landlord delay and none for tenant delay.

What if the allowance is not enough?

The tenant generally pays the excess unless the lease provides otherwise. A contractor’s budget before the letter of intent is the strongest protection.

Can a contractor put a lien on the landlord’s building for tenant work?

It can try. A lien against the owner’s interest generally requires the owner’s consent to the improvement, and leases commonly require the tenant to bond or discharge any lien within a short period.

What if the landlord never pays the allowance?

The tenant’s remedies depend on the lease. Tenants often negotiate a right to offset an unpaid allowance against rent, with interest, which landlords typically limit.

Who should hire the architect?

In tenant-built deals, the tenant usually hires its own architect and engineer, subject to landlord approval of plans. In turnkey deals, the landlord’s architect designs to the tenant’s program.

How long does landlord approval of plans take?

As long as the lease allows. Tenants should negotiate firm response times and a deemed-approval or escalation process if the landlord does not respond.

Can unused allowance be applied to rent?

Only if the lease allows. Some leases let a tenant apply a portion of an unused allowance to rent; others forfeit it after a deadline.

What does a landlord need before releasing the allowance?

Typically paid invoices, lien waivers, an architect’s certification, final sign-offs, and confirmation that no default exists.

Who owns the improvements at the end of the lease?

Most leases provide that improvements become the landlord’s property, while specialty alterations must be removed if the landlord requires. The lease should identify those items when plans are approved.

What if construction damages another tenant’s space?

The tenant and its contractors are generally responsible under the lease and their insurance. The work letter should require adequate insurance and indemnity from the contractors.
Contact

Get in touch

Tell us about the space, the parties, and the timing. Initial consultations are complimentary, and we provide a clear scope and fee quote at the outset.

Send an inquiry

Tell us about the matter and we will respond within one business day.

All inquiries are confidential. Initial consultation is complimentary. We will respond within one business day.

Skip to main content